Diagram showing three stage: at the top, a checkmark in a circle labeled 'Before Permits'; in the middle, a circle with 'OK' labeled 'After Permits'; at the bottom, an 'X' in a circle labeled 'Construction' with lines connecting the stages indicating order.

Development phase for Go Nuts Design to jump in: